How long does Korean cosmetics OEM development take?

Korean cosmetics OEM takes 1 to 4 weeks per stage from brief confirmation to full production, and packaging design runs in parallel with formula sampling to shorten the overall timeline.

Basis: As of September 2026, based on DIO field experience · Published 2026-09-21 · Updated 2026-09-21

The table below shows how long each stage actually takes in a DIO OEM project. Some stages run in parallel, so the total is not a simple sum of the rows.

Development time by stage
StageTimeNotes
Brief confirmation and formula design1 week
Sample production and revisions2 weeksUsually 3 revisions, all 3 within 2 weeks
Stability and safety testing3 weeksRuns during the manufacturing stage
Packaging design and printing3 weeksRuns in parallel with formula sampling
Full production4 weeks
Export documents and shipping3 days

Frequently asked questions

How many sample revisions are included?
Usually 3 revisions, and all 3 are completed within 2 weeks.
When does packaging design start?
It starts together with formula sampling. Done sequentially instead, it would add the full 3 weeks.
How long do export documents and shipping take?
3 days after full production is complete.