OEM Data

What makes up a Korean cosmetics OEM quotation?

In a Korean cosmetics OEM quotation, the largest item is the formula (raw materials and manufacturing), followed by the container and packaging components, while the carton, label, and printing are a small share. Design and development is a separate line item, usually around KRW 300,000 per project.

Basis: As of September 2026, based on DIO field experience · Published 2026-09-21 · Updated 2026-09-21

The table below lists the items that actually appear in a DIO OEM quotation and how much each weighs. Percentages vary by formulation and quantity, so the items are ordered by size.

Quotation items and their share
ItemShareWhat it covers
Formula (raw materials and manufacturing)LargestRaw materials per the formula, manufacturing and filling
Container and packaging componentsSecondBottles, tubes, pumps and similar
Carton, label, printingSmallCarton, label, printing
Design and developmentSeparate line item, usually around KRW 300,000 per projectContainer and carton design development

Frequently asked questions

What is the largest item in the quotation?
The formula (raw materials and manufacturing), followed by the container and packaging components.
Is design charged separately?
Yes. Design and development appears as a separate line item in the quotation, usually around KRW 300,000 per project.
Where should I look first to lower the quotation?
Start with the largest items, the formula and the container. Printing is a small share, so cutting it changes the total very little.